The cement sidewalk around the outside of the playground equipment area has been completed. The gravel-sand base is being leveled and then the 22 tons of crumb rubber can be poured on top.
![]() |
Sidewalk Border |
![]() |
Construction class adding sand to level the base |
![]() |
22 Tons of crumb rubber waiting patiently |