The schools hired a consultant to do a feasibility study looking at the concepts on the page below.
Concept A is to maintain high schools in both locations, Concept B is a 5-8 in one site and a 9-12 in the other. Concept C is a 6-8 in one site and 9-12 in the other.
All concepts have Elementary schools in both sites.
The study results will be presented to the school boards at a joint meeting November 27. Bancroft-Rosalie will have the study on the December Board Agenda for community discussion.